4 - 83
2. M-NET control
YKB/YLM 2nd
S.D. R2
MEE15K022
1-phase 220-240VAC power supply is needed.
The power supply unit PAC-SC51KUA is not necessary when connecting only the LM-AP
. Y
et, make sure to change
the power supply changeover connector CN41 to CN40 on the LM-AP.
2-3-4. Power supply to LM-AP
1-phase 100-240VAC power supply is needed.
The power supply unit PAC-SC51KUA is not necessary
.
The expansion controller supplies power through TB3, which equals 6 indoor units. (refer to Table 2-3-2)
2-3-5. Power supply to expansion controller
1-phase 100-240VAC power supply is needed.
The power supply unit PAC-SC51KUA is not necessary when only BM ADAPTER is connected.
Yet, make sure to move the power jumper from CN41 to CN40 on the BM ADAPTER.
2-3-6. Power supply to BM ADAPTER
1-phase 100-240VAC power supply is needed.
The power supply unit PAC-SC51KUA is not necessary when connecting only the AE-200E/AE-50E/EW-50E.
2-3-7. Power supply to AE-200E/AE-50E/EW-50E