PEFY
MEE15K022
2. EXTERNAL DIMENSIONS
YKB/YLM 2nd
Unit : mm
 T
erminal
bed
(Power source)
 T
erminal
bed
(T
ransmission)
Less than 300mm
170mm
±
5mm
(Actual Length)
Lifting bolt
Refrigerant piping brazing connection
                 (gas
A
 copper tube)
 
····
Refrigerant piping brazing connection
                 (liquid B copper tube)
 
····
Drain hose I.D. 32 (1-1/4")
 
<flexible joint 200mm>(accessory)
····
24
10
50x6=
300
50x7=
350
327
30
2
1
21-ø3
22-ø3
1250
50x21=
1050
25
102
50x20=
1000
50
15
100
420
35
20
1
120
10
1067
15
29
470
340
105
44
164
20
41
489
422
95
249
23
1326
(Lifting bolt pitch)
1372
1
100
420
1
124
1034 (Lifting bolt pitch)
60
340
1
100
Drain pipe
O.D. 32 (1-1/4")
3
Control box
Drain hole
(Knockout hole, for
 optional Drain pump use.)
Less than 550mm
When installing the drain water lifting-up mech(option).
Keep duct-work length 850mm or more.
Air outlet
Air inlet
3
Note :
1. Use M10 screw for the lifting bolt
(field supply).
 
2. Keep the service space for the
maintenance from the bottom when
the heat exchanger is cleaned.
 
3. Make sure to install the air filter(field
supply)on the air intake side.
In case field supplied air filter is
used, attach it where the filter
service is easily done.
1
2
3
PEFY
-P200, 250VMH-E
Model
A
B
P200VMH-E
ø19.05ø22.2
ø9.52
ø9.52