1 .. 14 15 16 17 18 19 20 21 22 23 24 .. 908
1 - 14
PE
F
Y
MEE15K022
2. EXTERNAL DIMENSIONS
YKB/YLM 2nd
ø12.7
ø15.88
ø6.35
ø9.52
Model
A
800
800
800
1050
1250
B
754
754
754
1004
1204
C
680
680
680
930
1
130
D
600
600
600
850
1050
E
550
550
550
800
1000
H
500
500
500
800
1000
F
50
5050
25
25
G
11
11
11
17
21
J
10
1010
15
19
K
450
450
450
700
900
L
780
780
780
1030
1230
M
ø12.7
ø15.88
ø15.88
N
ø6.35ø9.52
ø9.52
P40VMH-E
P50VMH-E
P63VMH-E
P71·80VMH-E
P100·125 ·140VMH-E
 T
erminal
bed
(T
ransmission)
 T
erminal
bed
(Power source)
Note : 1. Use M10 screw for the lifting bolt (field supply).
2. Keep the service space for the maintenance from the bottom when the heat exchanger is cleaned.
3.
This chart indicates for PEFY
-P100·125·140VMH-E models, which have 2 fans.
    PEFY
-P40·50·63·71·80 models have 1 fan.
4. Make sure to install the air filter(field supply) on the air intake side.
    In case field supplied air filter is used, attach it where the filter service is easily done.
Refrigerant piping flare connection (gas M copper tube)    ···············
Refrigerant piping flare connection (liquid N copper tube)
 ···············
Drain hose I.D. 32(1-1/4") <flexible joint 200mm> (accessory)
···
Drain hole
(Knockout hole, for
 optional Drain pump use.)
Control box
2
1
30
Drain pipe
O.D. 32(1-1/4")
T
erminal box
340
D
814
(Lifting bolt pitch)
B (Lifting bolt pitch)
A
904
Lifting bolt
383
60
23
15
80
3
50
10
F
G-ø3
J-ø3
50
50x(J-1)=K
250
E
Less than 550 mm
Less than 300mm
170mm±5mm
(Actual length)
24
50x(G-1)=H
50
50x5=
250
45
10
340
17
900
847
15
29
380
50
50
50
50
250
25
328
94
41
130
77
387
343
200
92
When installing the drain water lifting-up mech(option).
C
41
70
Model:40~80 (Note3)
Air outlet
Air inlet
Keep duct-work length 850mm or more.
3
1
2
3
PEFY-P40, 50, 63, 71, 80, 100, 125, 140VMH-E
Unit : mm