2. EXTERNAL DIMENSIONS
DATA G10
OUTDOOR UNITS
2 - 200
HP
1
Secure enough space around the unit as shown in the figure below
.
2
When the height of the walls on the front,back or on the sides<H>
exceeds the wall height limit as defined below
add the height that exceeds the height limit <h> to the figures that
are marked with an asterisk.
1.Required space around the unit
2.Foundation work
<W
all height limit>
Front
:
Up to the unit height
Back
:
Up to 500mm from
the unit bottom
Side
:
Up to the unit height
Detachable leg
Detachable leg
Corner of the
installation leg
M10 anchor bolt
<field supply required>
30mm max.
·
With a space of at least
300mm
to
the
wall
on
the back of the unit
·
With a space of at least
100mm
to
the
wall
on
the back of the unit
30mm max.
<Side view>
H
h
h
H
Front
<T
op view>
<T
op view>
Front
Corner of the
installation leg
M10 anchor bolt
<field supply required>
Front
Unit height
<T
o be left open>
<T
o be left open>
<T
o be left open>
<T
o be left open>
<T
o be left open>
<T
o be left open>
<T
o be left open>
30 min.
450 min.
450 min.
15 min.*
15 min.*
50 min.*
50 min.*
300 min.*
450 min.*
100 min.*
450 min.*
300 min.*
450 min.*
100 min.*
450 min.*
100 min.
450 min.*
450 min.
450 min.
100 min.*
15 min.*
300 min.*
900 min.
300 min.*
300 min.*
900 min.
1000 min.*
500
In case of collective installation
1
When multiple units are installed adjacent to each other
, secure enough space to allow
for air circulation and walkway between groups of units as shown in the figures below
.
2
At least two sides must be left open.
3
As with the single installation, add the height that exceeds the height limit<h>
to the figures that are marked with an asterisk.
1
T
ake into consideration the surface strength,water drainage route,
piping route,and wiring route when preparing the installation site.
<Note that the drain water comes out of the unit during operation.>
2
Build the foundation in such way that the corner of the installation leg is
securely supported as shown in the right figure.(Fig.A,B)
When using a rubber isolating cushion, please ensure it is large enough
to cover the entire width of each of the unit's legs.
3
The protrusion length of the anchor bolt must not exceed 30mm.(Fig.A,B)
4
Use four fixing plates as shown in the right figure <field supply required>
when using post-installed anchor bolts.(Fig.C,D)
5
T
o prevent small animals and water from entering the unit and damaging its parts,
close the gap around the edges of through holes for pipes and wires with
filler plates <field supply required>.
6
When the pipes or cables are routed at the bottom of the unit,
make sure that the through hole at the base of the unit does not get blocked
with the installation base.
7
Refer to the Installation Manual when installing units on an installation base.
<Unit:mm>
Front
W
all <H>
Front
W
all <H>
<T
o be left open>
W
all <H>
W
all <H>
W
all <H>
<T
o be left open>
Front
W
all <H>
<T
o be left open>
<Unit:mm>
Front
W
all <H>
W
all <H>
Front
Front
Front
Front
Front
Front
W
all <H>
W
all <H>
Fixing plate
<field supply required>
Fixing plate
<field supply required>
Fig.D (with detachable legs)
Fig.C (without detachable legs)
Fig.B (with detachable legs)
Fig.A
(without detachable legs)
PUHY
-HP200, 250YHM-A(-BS)
Unit : mm
In case of single installation