1 .. 92 93 94 95 96 97 98 99 100 101 102 .. 908
1 - 92
PEFY-E-F
MEE15K022
2. EXTERNAL DIMENSIONS
YKB/YLM 2nd
100
Keep duct-work length 850mm or more.
Air outlet
Air inlet
170±5
78
When installing the drain water lifting-up mech(option).
3
Less than 550
4-14X30
Ceiling surface
Make the access door at the appointed position properly for maintenance.
 T
erminal
bed
(Power source)
 T
erminal
bed
(T
ransmission)
  
Lifting bolt
24
10
More than 20
More than 20
50x6=300
50x7=350
327
30
2
1
22-ø3
22-ø3
1250
50x21=1050
25
102
50x20=1000
50
15
420
35
20
1
120
10
29
15
1067
470
340
105
44
164
20
41
489
422
95
249
23
1326(Lifting bolt pitch)
1372
1
100
420
1
124
1034(Lifting bolt pitch)
60
340
11
0
0
Drain pipe
O.D.32 (1-1/4")
Access door
3
Control box
Drain hole
Note2
Access door
450
200~300
450
730
1350
50
50
800
150~200
······
······
······
Required space for service and maintenance
 
ø
19.05
 
ø
22.2
PEFY
-P200VMH-E-F
Model
A
B
PEFY
-P250VMH-E-F
ø
9.52
ø
9.52
Refrigerant piping brazing connection(gas
A
 copper tube)
Refrigerant piping brazing connection(liquid B copper tube)
Drain hose I.D. 32 (1-1/4") <flexible joint 200mm> (accessory)
Note 1.Use M10 screw for the lifting bolt (field supply).
 
 2.Keep the service space for maintenance from
 
    the bottom when the heat exchanger is cleaned.
 
 3.Make sure to install the air filter (field supply) on
  
    the air intake side.
 
    In case field supplied air filter is used, attach it
 
    where the filter service is easily done.
170mm±5mm (Actual length)
Less than 300mm
(Knockout hold, for
 optional Drain pump use.)
PEFY
-P200,250VMH-E-F
Unit : mm
1
2
3