1 .. 156 157 158 159 160 161 162 163 164 165 166 .. 908
1 - 156
PCFY
2. EXTERNAL DIMENSIONS
YKB/YLM 2nd
MEE15K022
Unit : mm
PCFY
-P63VKM-E
(Drainage)
When drain socket
is installed
2
246
When drain socket
is installed
233
Air intake
5
4
1
2
3
6
7
8
9
Knock out hole for upper drain pipe arrangement
Knock out hole for fresh air intake Ø100
Knock out hole for wiring arrangement 2-Ø22
Knock out hole for wiring arrangement 2-Ø26
Drainage pipe connection(26mmI.D.)
Drainage pipe connection(for the left arrangement)
Knock out hole for left drain-piping arrangement
Refrigerant-pipe connection(gas pipe side/flared connection)
Refrigerant-pipe connection(liquid pipe side/flared connection)
NOTES.
1.Use M10 or W3/8 screw for anchor bolt.
2.Please be sure when installing the
  drain lift up mechanism(option parts),
  refrigerant pipe will be only upward.
Air outlet
233
Electrical box
When electrical box
is pulled down
Electrical box
9
7
In case of the rear pipe arrangement,make sure that
remove the shaded portions from the independent piece.
Then put the independent piece back in initial
position.(The heat exchanger might be clogged because of dust)
5
10
51
246
180
200
236
150
62
140
18
1237(Suspension bolt pitch)
320
680
80
84
88
195
230
57
254
476
680
182
85
1
198
8
4
8
260
24
38
85
86
2
126
169
37
121
138
190
1
18
38
120°
1280
2
2
1
173
124
76
46
190
75
387
461
2
3
8
5
1
4
Ø
125
6
8
[FRONT
 VIEW]
Ceiling
(Drainage)
(gas  Ø15.88)
(liquid  Ø9.52)
Accessory···Drain socket (I.D. 26)