1 .. 122 123 124 125 126 127 128 129 130 131 132 .. 908
1 - 122
PLFY
2. EXTERNAL DIMENSIONS
YKB/YLM 2nd
MEE15K022
Unit : mm
3
3
1
2
W
ater filling port
2
1
3
Air filter
20
338~353
4-ø2.8Mounting hole
Standard center panel
(CMP-125VL
W
-B)
Branch duct ø200 knock out hole (both side)
4-ø2.9Mounting hole
Fresh air intake ø150 knock out hole
90°
ø224
45°
90°
ø172
90°
303
170mm±5mm(Actual length)
600mm Max
300mm or less
45
More than 350
155
255
127
127
107
574
1970
670
48
48
107
1756
68
68
574
(Lifting bolt pitch)
192
1970
(Ceiling opening)
670
(Ceiling opening)
20
20
710
2010
20
20
290
606
145
856
1708
1756
(Lifting bolt pitch)
181
235
Drain pipe
O.D.32 (1-1/4")
222
Control box
T
erminal box
T
erminal bed
(Power source)
70
333
38
106
476
70
178
606
T
erminal bed
(T
ransmission)
Note:
1.Use M10 screw for the lifting bolt (field supply).
<
f
l
a
r
e
>
Gas pipe
ø15.88
Liquid pipe
ø9.52
 
Drain hose I.D. 32 (1-1/4") <flexible joint> (accessory)
PLFY
-P125VLMD-E